A systematic assessment conducted to evaluate the technical, economic, environmental, legal, and social viability of a proposed project.

Project Name

-

Project Location

Kunal (Khani) Khola Bridge along Jamune Aali-Duni Daha road in Surkhet District.

Total Districts

1

Total Contract Amt.

NPR 954,850.00

Clients

-

Start End Dates

Apr 2019 - Jul 2016

Project Description

Activities Completed

A Feasibility Study is a systematic assessment conducted to evaluate the technical, economic, environmental, legal, and social viability of a proposed project. It determines whether a project is achievable and sustainable within given constraints and identifies potential risks and alternatives.

The study provides decision-makers with evidence-based recommendations on whether to proceed, modify, or abandon a project before committing significant resources.

Projects

Feasibility Study, Detailed Engineering Survey, Soil Investigation, Hydrological Study and Detailed Design of Kunal (Khani) Khola Bridge along Jamune Aali-Duni Daha road in Surkhet District.

  • Project Location: Kunal (Khani) Khola Bridge along Jamune Aali-Duni Daha road in Surkhet District.
  • Total Contract Amount: NPR 954,850.00
  • Apr 2019 - Jul 2016

Walkover Survey, Feasibility Study, Detailed survey, Design, Cost estimates, IEE was conducted with inclusive of preparing Resettlement plan of Khulalu-Bhatadi Road (37.0 km). In addition, construction supervision with LEP Approach (Green Road concept) was carried out for Rengil-Lainfu, Road (24.0 km) The services were provided for Decentralized Rural Infrastructure and Livelihood project Kalikot District

  • Project Location: Kalikot district
  • Total Contract Amount: NPR 29,147,639.00
  • Dec 2006 - Oct 2011